ECRA/ESA Lic. 7000000Licensed Electrical Contractor · ESA notification filed for permitted workElectrical emergency?
CybertronElectrical
Circuit 01

Level 2 EV charging

  • Load review before anything is installed
  • Charger location planned around the garage or driveway
  • Load management (EVEMS) when the panel is near capacity
  • Notification filed and work inspected
Check capacity for an EV
Level 2 EV charger mounted on a garage wall
Circuit 02

Backup power

Essential circuits

Choose what must stay on: furnace, fridge, sump pump, lights.

Transfer switch

Safely separates the home from the grid while the generator runs.

Portable generator hookup

An inlet and switch instead of extension cords.

Standby generators

Planning for automatic backup systems.

Generator transfer switch beside a panel
Circuit 03

Never backfeed a panel

Plugging a generator into an outlet can energize utility lines and endanger line workers. A transfer switch or interlock is the safe way to connect backup power.

Next step

Plan the load. Then book the work.

Run the Capacity Planner, then send the result with your booking.