
Stop the bond
Brine on dry pavement hours before snow keeps it from freezing to the surface. Less salt, faster clearing.
Pavement temperature — not air temperature — decides what actually melts. Watch which materials keep working.
Approximate practical working ranges. Real performance depends on sun, traffic, product blend and application rate.
Good ice control is timing first, material second.

Brine on dry pavement hours before snow keeps it from freezing to the surface. Less salt, faster clearing.

Salt or blends spread after plowing, at a rate set for the temperature and the amount of ice.

Sand or grit when it is too cold for salt, plus hand spot-treatment on steps, ramps and doorways.
Approximate guidance — performance depends on pavement temperature, sun, traffic and the product.
| Material | Best for | Works down to (approx.) | Notes |
|---|---|---|---|
| Rock salt (sodium chloride) | General de-icing on lots and walks | −9 to −12 °C pavement | Lowest cost; slows sharply in deep cold |
| Pre-wet salt | Faster start, less bounce | Slightly colder than dry salt | Salt sprayed with brine as it is spread |
| Liquid brine | Anti-icing before a storm | Depends on the blend | Uses far less salt when conditions suit |
| Magnesium / calcium chloride | Colder days, steps, entrances | Well below rock salt | Higher cost; used selectively |
| Sand / grit | Traction in extreme cold | Any temperature (does not melt) | Needs spring sweeping |
Over-salting damages concrete, landscaping and local waterways — and does not make a surface safer. Many Canadian municipalities and property managers now ask how a contractor manages salt.
Spreaders checked so material goes down at the intended rate.
Application rates set by temperature and ice type, not one setting all winter.
Less salt near creeks, wells and planting beds, with traction alternatives.
Grit and leftover material swept up when the season closes.
Ask about salt-management training, such as the Smart About Salt program used by many Ontario contractors and property managers.
Site walks, staking and route planning happen in the fall. Lock in your trigger depth, service window and contract now — not after the first storm.