How a project runs
Each stage produces something you can see: photos, readings, a plan or a verified result.
Roofline walk
Eavestroughs, downspouts, roof edges and signs of ice damming.
- Overflow and sag checks
- Discharge locations noted
Ground & grading
Slope at the foundation, window wells, walkways, decks and downspout exits.
- Slope measured at each wall
- Low spots marked
Inside the basement
Moisture readings, staining, cracks, floor drain and sump condition.
- Moisture meter readings
- Crack map with photos
Drain camera
Where access allows, a camera inspection of the weeping tile or sewer lateral.
- Recorded video
- Roots, silt or breaks located
Written report & plan
Findings ranked by urgency, with options and prices you can compare.
- Least-invasive option first
- Permits and subsidies noted
Work, verify, maintain
Work completed to plan, then tested — flushed, run or inspected — with a maintenance schedule.
- Water tests where practical
- Seasonal checklist handed over
A report you can actually read
Every finding is rated OK, Watch or Act, with a photo and a plain explanation — so you can decide what to do now and what can wait.
Sample layout for illustration only.
About the process
How long does an assessment take?
Do I need to be home?
Will you always recommend excavation?
Can work be done in winter?
Not sure where the water is coming from?
A water assessment traces it from the roofline to the sewer line before anyone quotes a fix.